On Going Projects

Our valuable on-going projects are as below,

  • Provision of LAN Connectivity for IPAS at NGO- Annex Building in Chennai Division.
  • Provision of signalling arrangements in connection with extension of platform to accommodate 24 coaches in platform N0-1, Traffic facility work to hold 24 coaches and to modify fob for electrification at Mettupalayam in Salem division.
  • Proposed signalling reliability improvement works in Dindigul - Pollachi section in Madurai Division.
  • Public Amenities and Telecommunication arrangement for Southern Railway.
  • Signalling arrangement in the proposed Subway for Southern Railway.

Provision of LAN Connectivity for IPAS

  • IPAS is unique software using in Indian Railway for Accounts and Financial Data management. We are providing complete LAN connectivity for using IPAS software at NGO building by supply, installation and Commissioning of LAN cables, networking equipments.

Provision of signalling arrangement

  • The scope of work involves complete shifting of the Signalling equipments 500 meters away from the Top point of a Road. The work includes Excavation of Trenching, Cable lying, Erection of Signal and Location boxes, Provision of Point machines and Track Circuits.
  • This work can be extended to the Alterations in the logic of Electronic Interlocking due to the modification of signalling arrangement and the preparation and Submission of Complete Drawings for the modifications.

Public Amenities and Telecommunication Arrangements

  • The scope of work involves the Supply, Installation and Commissioning of amplifiers, Speakers and Microphones at Villupuram, Vellore, Arni, Polur, Tiruvannamalai and Thirukovilur sections in Tiruchchirappalli Division.
  • The scope can be extended to the supply, provision and testing of the Krone modules, Telephone Cables, Routers, Switches and Surge Protection device.

Signalling Reliability Improvement works

  • The scope of work involves the signal reliability improvement in Dindigul to Pollachi section in Salem division by laying signal cables up to 15 KMs (Approx.) and erection of Apparatus cases and signals.
  • The work includes the Supply, installation and commissioning of Auto Change over the system, Earth Leakage detectors and the Cards of axle Counter, to improve the Signalling reliability.

Signalling Arrangement in the proposed Subway (LUS)

  • LUS refers to the Limited Usage Subway, constructed in the rural area, which ensures the utility of both Train and Vehicle efficiently and safely.
  • The extent of work involves the provision of temporary cables connectivity during the LUS construction.
  • Temporary cables will be terminated upon the erection of apparatus cases, and provision of GI pipes.